Permeable formwork is studied and applied in Phase III Project of Yantian Port Area.
在盐田港区三期工程中,对透水模板进行了试验研究并在工程中应用。
Container throughput of Yantian Port witnessed a fall due to the deteriorating global economy, and the asking price of surrounding industrial properties began to drop.
受到外围经济环境恶化影响,盐田港近期货运吞吐量下降,周边工业物业叫价也出现下调趋势。
The natural conditions, port site selection, construction scale of the 1st phase project and overall layout design, etc. of Yantian Port are briefly introduced.
简要介绍盐田港的自然条件、港址选择,一期工程建设规模及总平面设计等情况。
With a joint investment of RMB 240 million from YICT and Yantian Port Group (YPG), the Mingzhu Interchange opened to traffic on 12 December 2003.
2003年12月12日,盐田国际与深圳盐田港集团共同投资2.4亿元人民币兴建的明珠立交建成通车。